Case Studies

Here you will find several detailed case studies related to Kompozit'all UK heating and ventilation products:

Edwardian-era-house-Condensate Staining.jpg

Edwardian era house (Condensate Staining)

Job type: Condensate Staining
Length:
Diameter:
Project Length: 1 day
Completed by: Turner Baker
Isle-of-Wight-Council-office.png

Isle of Wight Council office - Isle of Wight

Job type: Leaking Flue
Length: 28M
Diameter: 450mm
Project Length: 2 days
Completed by: Toast
Mayfair-London.png

Mayfair - London

Job type: DFE/Gas Open Fire
Length:
Diameter:
Project Length: 1 day
Completed by: Toast
Pittodrie-House-Hotel.png

Pittodrie House Hotel Aberdeen AB51 5HS

Job type: Failed Smoke test
Length:
Diameter:
Project Length: 2 days
Completed by: Old Mill Chimneys
Courtfield-Gardens.jpg

Courtfield Gardens (London SW5 0PD)

Job type: DFE/Gas Open Fire
Length: 22M
Diameter: 275mm
Project Length: 1 day
Completed by: Greystone Chimneys
brightontownhall.png

Brighton Town Hall

Job type: Steel Flue liners fail
Length:
Diameter: 300mm
Project Length: 1 day
Completed by: Greystone Chimneys
University-College-London.jpg

University College London Darwin Building - U duct

Job type: SE & U Duct
Length:
Diameter:
Project Length: 1 day
Completed by: Kompozit’all UK
Fallkirk-Church.jpg

Fallkirk Church

Job type: Leaking Chimney
Length:
Diameter:
Project Length: 1 day
Completed by: Old Mill Chimneys
Hogarth_Press_House,_Richmond,_Surrey.jpg

Hogarth’s House Richmond

Job type:
Length:
Diameter: Ground floor: Right hand side of building 2 x 13
Project Length: 4 days
Completed by: Flueliner Solutions
Palmerston Road Wimbledon, London.png

35 Palmerston Road Wimbledon, London

Job type:
Length:
Diameter: 10m in length with a rectangular diameter of 254mm
Project Length: 2 days
Completed by: Flueliner Solutions